Namma Metro

KIADB is the acquiring body for Bangalore Metro Project, christened as “Namma Metro”. This Project is envisaged not only to be a major component of the Bangalore city transportation infrastructure but also to significantly reduce carbon emissions. Besides being an environment friendly project, Namma Metro adds to the comfort level of travel.

 

The Project has an East-West Corridor – 18.10 km long, starting from Baiyappanahalli in the East and terminating at Mysore road terminal in the West and a 24.20 km North-South corridor commencing at Nagasandra in the North and terminating at Puttenahalli in the South. Out of a total of 42.30 km system about 8.80 km is underground section and balance about 33.50 km is elevated. Total 40 stations are planned, out of which 7 stations are underground, 2 at grade and 31 are elevated.

Land Acquisition details of Namma Metro Project

Sl.No News Particulars
1. Preliminary Notification under section 3(1), 1(3), 28(1) for BMRCL phase-2 project
Posted on 24-10-2013
Click here to download notification in PDF format
2. Preliminary notification under section 3(1), 1(3), 28(1) for BMRCL phase-2 project
Posted on 21-10-2013
Click here to download notification in PDF format
3. 28(1) for BMRCL phase-2 project posted on 03-01-2015 Click here to download notification in PDF format
4. 28(1) for BMRCL phase-2 project Posted on 03-01-2015 Click here to download notification in PDF format
5. 28(4) for BMRCL phase-2 project Posted on 03-01-2015 Click here to download notification in PDF format
6. 28(1) notification dated 14-05-2015 in respect of Reach-1 extension from Mahadevapura to Satya Sai Hospital Station.
Posted on 18-05-2015
Click here to download notification in PDF format
7. 28(4) notification –Puttenhalli cross to Krishna leela park station
Posted on 03-07-2015
Click here to download notification in PDF format
8. 28(1) notification dated 23-07-2015 in respect of Rach-5 (from silk board to Muneshwaranagar Station)
Posted on 07-09-2015
Click here to download notification in PDF format
9. 28(1) notification dated 08-10-2015 in respect of Reach-5 Depot (Hebbagodi)
posted on 10-10-2015
Click here to download notification in PDF format
10. 28(1) notification dated 08-10-2015 in respect of Reach-6 depot (Kothanur)
Posted on 10-10-2015
Click here to download notification in PDF format
11. 28(1) notification dated 15-10-2015 in respect of Reach-5 stations and viaduct
Posted on 19-10-2015
Click here to download notification in PDF format
12. 28(1) notification dated 15-10-2015 in respect of Reach-1 stations and viaduct Posted on 19-10-2015 Click here to download notification in PDF format
13. 28(4) notification dated 29-10-2015 in respect of Rach-2 jnanabharathi station & related viaduct
Posted on 11-11-2015
Click here to download notification in PDF format
14. 28(1) notification dated 05.11.2015 in respect of Reach-6 from Gottigere to Diary Circle (Stations & Viaduct)
Posted on 11-11-2015
Click here to download notification in PDF format