Building Plan

Application for Approval / Building Plan Approval and Initial Certificate Issuance and Residence Certificate to be submitted by Online Mechanism at the KIADB Web Portal (www.kiadb.in)

Sl.No Details
(a)


Development Plan / Building Plan

  1. The Appellant / Applicant should submit the disclaimer along with the appropriate documents / requisite along with the application. (Please visit the KIADB Online Portal (www.kiadb.in)
  2. The disclosure letter / approval letter required for the Development Plan / Building Plan approval should be contacted by the concerned Department / Board / Authority using online links below. (Please visit the KIADB online portal (www.kiadb.in)
  3. The fee charged for building planning approval is to be paid only using E-Payments (Rs 1 to Rs 500 crore can be paid using RTGS / NEFT / Credit Card / Debit Card).
  4. A copy of the development plan / building project should be submitted for approval for the concerned zone office development officer.
  5. Architectures / Engineers / Construction Engineers / Urban Planners who have been included in the KIADB’s Committee for Development Project / Building Plans should submit and sign their signature and seal. (www.kiadb.in)
  6. Plot inspection proposed at the time specified should be made by the concerned Development Officer and the inspection report should be uploaded on the KIADB website in the specified format along with Sketch. (click here) (Government Circular Number CI 8 SPI 2015 Date 30/4/2015 and KIADB Circular Number KIADB / JDTP / 55 / 2016-17 as of 1/4/2016).
(b)


Initial Certificate and Residence Certificate:

  1. The Appellant / Applicant should submit the disclaimer with the application along with the appropriate documents / requirements. (Please visit the KIADB Online Portal (www.kiadb.in)
  2. Please contact the concerned Department / Board / Authority under the online links below for the Refusal Letter / Approval Letter (Please visit the KIADB Online Portal (www.kiadb.in)
  3. Plot inspection proposed at the time specified should be made by the concerned Development Officer and the inspection report should be uploaded at the KIADB website in a specified format with Sketch (click here) (Circular number CI 8 SPI 2015 Date 30/4/2015 and KIADB Circular Number KIADB / JDTAP / 55 / 2016-17 dated as of 1/4/2016).
  4. After approval, the initial certificate and residence certificate will be uploaded on the website with a seal and signature.

P1-development project and building map inspection and approval

P2 – start and acquisition letter